
In an electric call management the second coil (see wiring diagram) is only used for a short. It excited low-voltage EDS, which is sufficient to power the bulb 2.5—3.5 V. They can be decorative to make, incorporating, for example, in some plastic toy. Then she’s pressing the call button will light up. Optional lamp you can turn off the switch SA1.
AVDEYEV
Recommend to read
“THE UGLY DUCKLING” BY WALTER BLUM
The rapid construction of the armed forces began in Germany with the rise to power of Adolf Hitler. Moreover, all types of weapons developed in accordance with far-reaching plans of the...
Motorized mono-ski
Last spring I built myself water skis. But I rarely got to ski on them, since the tow was provided by… a motorcycle with a sidecar. Building a dedicated boat would have meant considerable...