PI is required to move large sheets of plywood or hardboard, and the door of the greenhouse, or glassed-in frames — it is always difficult: the load is not so heavy but bulky and uncomfortable, not immediately figure out how to take it. Very easier task 1ростое fixture; it consists of a wooden grip in the form of an inverted letter G with a slot in a vertical rack and connected with it the bolt with a lamb short socket with a handle. Adjusting the length of the resulting vertical posts mounted on horizontal platform of a cargo and carry it, as shown in the figure.
Recommend to read
PERENIMAET SLIDES When the need arises to duplicate any negative or slide, the question is how to do it. Contact method seems to be the easiest, but not always acceptable due to the complexity of...
“BIRDS” OF THE AMERICAN AND EUROPEAN FLEETS The United States waited almost three years before entered the First world war. And during this time the leadership of the naval Ministry was attentively get accustomed to all the...