THE GAZEBO UNDER THE TENT

GAZEBO CURTAINSFor many years in his garden plot as a temporary shelter for the summer we built a wooden frame and pulled at his canvas tent. But every time it ended, he to the end of the season were shredded, and then just went to pieces. When we got tired, I decided to build a more substantial gazebo, the main material which was to be a tree. It was designed a small – size only 3. 2×3 m.

First, of course, spaced ground locations under nine columns of the Foundation. They dug small pits with dimensions of 0 5×05 m and a depth of 0.5 m. also filled them with sand and well rammed. Laid on top of concrete tiles size 40x40x4 see them – a series of masonry and concrete blocks. All, of course, aligned on the level.
 
Initially, there were doubts about the “durability” of such a simple Foundation. However, it took almost four years – and nothing looked.
 
The lower harness gazebo made of timber with a size of 150×100 mm, putting it on the Foundation blocks at the edge of the narrower side. Joined bars of metal parts with dimensions of 100×100 mm.
The joists under the floor (100×50 mm) “imbedded” 30 mm – the thickness of the chosen floor Board, connecting with strapping also corners.
 
Stand (timber 100×100 mm) was selected with a height of under 2.5 m. Thought too high, but it was later revealed that pull up the gazebo was much prettier and more impressive “undersized”.
 
The bottom rail of the boards of 150x100 mm and floor beams of the beams 100x50 mm (bonded metal parts)
 
The bottom rail of the boards of 150×100 mm and floor beams of the beams 100×50 mm (bonded metal parts)
 
Embedding (1) and compound (2) with screws the boards of the corner uprights and top cord Fastening the rafters to the beams of the upper piping of double corners (3) the Mounting beams of the waist metal corners (4) Mount ocasin with screws to the uprights (5) and bottom rail (6)
 
Embedding (1) and compound (2) with screws the boards of the corner uprights and top cord. Mount the rafters to the beams of the upper piping of the double angles (3). Mounting rails bottom trim metal corners (4) Mount ocasin with screws to the uprights (5) and bottom rail (6)

 
At the top of the b-pillars have cut the groove for connecting the boards (100×50 mm) top framing “vpoldereva” corner – “vpoldereva” and “straight match”. Stand attached to the lower rail angles and bars to top with screws 6×100 mm.
 
In addition, to strengthen the racks set on three sides of the strut (50×50 mm) to a height of 1.0 m, attaching them with screws to the timber of the waist. Linked additional racks with the same bars and the same height, connecting them with the top of ucoin. There is sufficient rigidity of the whole structure.
Then lay a floor of grooved boards 30 mm thick, reinforced black screws with a length of 70 mm obliquely into the ridge. Outside at the height of 1.0 m studded gazebo with three sides of the lining, attaching it to the posts.
 
The plan of the waist and the Arab League sex
 
The plan of the waist and the Arab League floor:
 
1 – bottom rail (timber 150×100, 4 pieces); 2 – cross-lag (timber 100×50, 5 PCs); 3 – longitudinal lag (timber 100×50)

 
Frame (viewed from front)
 
Frame (viewed from front):
 
1 — front (timber 100×100, 8pcs); 2 — the railing (timber 50×50); 3 – the bottom rail; 4 —upper rail (timber 100×50,4 pieces); 5-rafters of the roof (timber 100×50, 8 PCs.)

 
When the lower part was finished, began perhaps the most difficult – the installation of rafters. They went the parallel bars with a size of 100×50 mm.
 
First, placing two of them on the floor under 20° (so conceived to bring the roof) to each other, connected nodes “vpoldereva” and fastened with screws 6×100 mm. Provided for the overhang of 400 mm. Then, combining time-rail, hoisted with the help of two friends (six hands) on the top rail across the structure. Here, in the place of attachment with her, cut the groove and bonded double metal corners on the screws. Then it was easier: put longitudinal timbers at close range with a cross cut on the corner of meeting and also after the corner, put together all the parts again. Eight of the rafters together at the top of the arbor in one unit. Connecting them with top rail – corner cutting under the rack.
Purlin roofs roofed clapboard, face down, and then covered her soft tile.
 
Nastilka of a floor from boards-
 
Nastilka of a floor from boards-“thirty” with a width of 140 mm
 
Skeleton gazebo
 
The frame of the gazebo
 
Solid sheathing the roof lining and roof of the soft tile
 
Solid sheathing the roof lining and roof of the soft tile
 
On the crate “walls” went Reiki dimensions 30×18 mm reinforced their lap. For decoration at the top of the facade of a closed furniture panel thickness of 18 mm, pre-cut jigsaw arc.
 
Last – put the balusters on the sides of the entrance.
 
I must say that all the posts, rafters, beams, jib, rails pre-installation protrayal, polished. Then covered in two layers of paint Tikkurila Valti Color, floors treated with oil paint.
 
V. YANKILEVSKY

Recommend to read

  • WATER COOLING THE CPUWATER COOLING THE CPU
    In this article I will try to tell about my attempt to make a water cooling system for CPU in the home. This will describe the highlights and technical details on my own experience. If...
  • DISKOBOLKADISKOBOLKA
    As well as natural and habitual in our apartments home libraries, does not surprise anyone today, and family library: records, magnetopulse, the compact cassette. The latter appeared...