THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • GARDENER-BUILDERGARDENER-BUILDER
    When the erection even garden shed great importance is the accuracy of the marking: for example, improperly laid Foundation can cause distortion and cracking of walls, roof and other...
  • BACK TO THE JIGSAW…BACK TO THE JIGSAW…
    This device allows you to consistently perform those operations which are performed simultaneously jigsaws, tension and clamp the blade. It is especially difficult to learn this kids —...