THE SHUTTERING OF ROOFING MATERIAL

THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • Perpetual wind fanPerpetual wind fan
    Many rural outbuildings need ventilation. Without it, houses and sheds become damp, cellars and basements get wet, and using an outdoor privy without a fan is, to put it mildly,...
  • AND SHVETS, AND THE REAPER…AND SHVETS, AND THE REAPER…
    Microstructure and tillers become a way of life. Now they are indispensable our helpers in the garden, the garden, the mowing. But I'm curious. With the expansion of the range of works...