THE SHUTTERING OF ROOFING MATERIAL

THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • THE GRIP ON THE LEASHTHE GRIP ON THE LEASH
    Bench drilling machines (such as NA-10, NA-12), as a rule, is at any station of young technicians in every school workshop. There are some in our school (I work as a teacher). And once a...
  • AT HIGH ANGLES OF ATTACKAT HIGH ANGLES OF ATTACK
    To maximize flight time Svobodnaya model championship class, usually try to use large angles of attack. However, flying often becomes unstable due to the disruption of flow from the...