THE SHUTTERING OF ROOFING MATERIAL

THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • VISE WITH GEARVISE WITH GEAR
    This device will serve you well — will facilitate the drilling of holes: in the grip gear grip force and a half times more than usual, which increases the reliability of fastening, and...
  • LOBED ON PILOTAGELOBED ON PILOTAGE
    What are the only propellers is not built by modelers. Due attention was paid to the three blade. Why not try to install them on a modern cord "acrobat"? If Yes, will any benefit from...