THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • JEEP COMPASSJEEP COMPASS
    For the first time this car in the style of military presented to the public on Detroitcom motor show 2002. I must say that the Jeep company, leading its history from the famous firm...
  • EXCAVATOR WITH MANUAL… “DRIVE”EXCAVATOR WITH MANUAL… “DRIVE”
    When laying the Foundation under the garden house, closing it, communications, the construction site has to dig a deep enough trench. In the usual way (man with shovel) it is difficult...