THE SHUTTERING OF ROOFING MATERIAL

THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • SNOWMOBILE FIRST, BUT A GOODSNOWMOBILE FIRST, BUT A GOOD
    The author of this material — a pupil from the far Siberian city. When we received his letter with a description of the constructed ski-track of a snowmobile, he was 15 and he was in the...
  • HOMESTEAD FARMERHOMESTEAD FARMER
    Electrofresh is intended for soil (top soil) household and cottage (with electricity) sites, hilling potatoes. Considering the rather difficult conditions: long continuous work,...