THE SHUTTERING OF ROOFING MATERIAL

THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • RING FROM THE BATTERYRING FROM THE BATTERY
    In homes today, it is used quite a lot of galvanic power sources (batteries). Even the most "long-playing"-of them at the end of life just thrown away, though their metal body remains as...
  • ALL-TERRAIN VEHICLE ON TRACKALL-TERRAIN VEHICLE ON TRACK
    This universal car 2 ton capacity designed for the transport of goods and people, as well as for towing trailers with a total weight of 2 tons in all road conditions. New advanced...