THE SHUTTERING OF ROOFING MATERIAL

THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • UNIVERSAL MACHINE TOOLUNIVERSAL MACHINE TOOL
    Versatility is the main advantage of the multi-operation woodworking machine I developed. It can handle turning work, planing, material sawing, drilling and milling, and tenoning...
  • “YAUZA” – A CAR FOR THE CITY“YAUZA” – A CAR FOR THE CITY
    “I intend to build a car for widespread use. It will be large enough to fit an entire family, but small enough for one person to operate it. It will be made of the best material and...