THE SHUTTERING OF ROOFING MATERIAL

THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • MICROCAR FDDMICROCAR FDD
    I was born in 1944, and almost from the first year of life I was haunted by a sound — an ominous growl bearings rolling on asphalt. The sound that accompanied the movement on a small...
  • THE KNURLING MAKES THE FILE…THE KNURLING MAKES THE FILE…
    In the manufacture of models or devices containing frequently unscrews detail, there is often a need to do the knurling (knurled) outer surfaces of the nuts or screw heads. With this...