THE SHUTTERING OF ROOFING MATERIAL

THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • UNIVERSAL RUBBER MOTORUNIVERSAL RUBBER MOTOR
    Still, the vast majority of models of submarines with rubber motor class EL-500 (500 mm in length) are built on the same scheme. However, the adopted version with the detachable bow and...
  • SOLDERING TIP FOR ICSOLDERING TIP FOR IC
    Soldering chips easy electric soldering iron with special tip (see figure). For this presleyana copper rod of diameter 4-5 mm drill hole Ø 0,8 mm at the depth of 6 mm. Drilling is...