THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • URAL VS “RHEINMETALL”URAL VS “RHEINMETALL”
    The victory of the Soviet troops in the forty-second and forty-third years had tipped the scales of war in our favor. The enemy got an object lesson. Failing two consecutive critical...
  • IRISH LEND ROVER IN ARMORED SUITIRISH LEND ROVER IN ARMORED SUIT
    The Shorland armored car ("Shoreland") - joint development of Irish firms of Short Brothers and Harland ("Short Bros & Harland") by order issued in 1961 Royal police force of...