THE SHUTTERING OF ROOFING MATERIAL

THE SHUTTERING OF ROOFING MATERIALWhen the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.

Recommend to read

  • “SANDWICH” UNDER KERN“SANDWICH” UNDER KERN
    Before you drill cylindrical in shape, its surface need to procure under the drill "the hole" — to stake. But not so easy to set the core to such detail. Helps may this simple device,...
  • TABLE-WORKSHOPTABLE-WORKSHOP
    Where to store the tools, how best to equip the workplace? To these questions every fan of tinkering responds differently. Want to share the experience easy and compact work area....