When the construction of the Foundation of the country house as a series of concrete columns are usually used wooden formwork. However, it is much easier to use for concrete formwork is not expensive in these times of boards, and the cylindrical form of roofing material.
Take a flat beam with a diameter slightly less than the diameter of the drill that you did in the soil hole under the bars, wrap it in two layers of roofing material and tie a soft wire. Then remove the beam, and the resulting tube down the designated hole in the ground, the bottom of which are lined with successively compacted layers of sand and gravel.
When all pipes are installed, fill them with liquid concrete and insert the four cut the reinforcing iron. After the concrete has hardened, excess reinforcement can be cut.
Recommend to read
THE MOTOR OUT…NAILS AND SCREWS
Before copiers that manufacture aircraft models in the Mel scale, often raises the problem of simulating a power plant with a radial engine. Offers an unusual method based on the use...
COVER – NOT THE DEFICIT!
Something I have done for drawings and diagrams, published in the journal under the heading "Club home of the masters". In one of the rooms was a note on the machine to edit used caps...